The term ‘cost’ in the construction industry generally refers to the amount that has to (or will have to) be paid to receive goods or services.
The total costs associated with a development may consist of a number of components.
Total costs will include construction costs, that is, those costs incurred by the actual construction works themselves, on some projects determined by the value of the contract with the main contractor. However, the construction contract may include costs that might not in themselves be considered literal construction costs (hard costs), such as fees, profits, overheads, and so on, and there may be construction works that are awarded by the client outside of the main contract (such as fitting out the interior, minor alterations to the completed works, installation of equipment, and so on).
In addition, there will be other costs associated with a development, such as land acquisition costs, fees for letting agents, marketing costs and contributions associated with planning permissions.
These are generally considered to be capital costs. However, beyond the completion of the construction contract, there will be other costs associated with operating the development which may not be capital costs, and ultimately, there will be costs associated with the demolition, deconstruction or disposal of the development.
Cost may also have wider interpretations, such as the environmental cost or the social cost of a particular purchase or action.
NB The Chartered Institute of Procurement & Supply (CIPS) Glossary of procurement terms, defines total costs as: ‘The total amount of costs spent, including fixed, variable, direct and indirect costs’
[edit] Related articles on Designing Buildings Wiki
- Accounting.
- Bill of quantities.
- Budget.
- Business plan.
- Capital cost.
- Cost certainty.
- Cost consultant.
- Cost control.
- Cost information.
- Cost plans.
- Cost.
- Cost.
- Front-loaded costs.
- Hard costs v soft costs.
- Life cycle costs.
- Operational costs.
- Outturn cost.
- Sunk cost.
- Total development cost.
- Utilising life cycle costing and life cycle assessment.
- Whole life costs.
Featured articles and news
The Association of Consultant Architects recap
A reintroduction and recap of ACA President; Patrick Inglis' Autumn update.
The Home Energy Model and its wrappers
From SAP to HEM, EPC for MEES and FHS assessment wrappers.
Future Homes Standard Essentials launched
Future Homes Hub launches new campaign to help sector prepare for the implementation of new building standards.
Building Safety recap February, 2026
Our regular run-down of key building safety related events of the month.
Planning reform: draft NPPF and industry responses.
Last chance to comment on proposed changes to the NPPF.
A Regency palace of colour and sensation. Book review.
Delayed, derailed and devalued
How the UK’s planning crisis is undermining British manufacturing.
How much does it cost to build a house?
A brief run down of key considerations from a London based practice.
The need for a National construction careers campaign
Highlighted by CIOB to cut unemployment, reduce skills gap and deliver on housing and infrastructure ambitions.
AI-Driven automation; reducing time, enhancing compliance
Sustainability; not just compliance but rethinking design, material selection, and the supply chains to support them.
Climate Resilience and Adaptation In the Built Environment
New CIOB Technical Information Sheet by Colin Booth, Professor of Smart and Sustainable Infrastructure.
Turning Enquiries into Profitable Construction Projects
Founder of Develop Coaching and author of Building Your Future; Greg Wilkes shares his insights.
IHBC Signpost: Poetry from concrete
Scotland’s fascinating historic concrete and brutalist architecture with the Engine Shed.
Demonstrating that apprenticeships work for business, people and Scotland’s economy.
Scottish parents prioritise construction and apprenticeships
CIOB data released for Scottish Apprenticeship Week shows construction as top potential career path.
From a Green to a White Paper and the proposal of a General Safety Requirement for construction products.
Creativity, conservation and craft at Barley Studio. Book review.
The challenge as PFI agreements come to an end
How construction deals with inherited assets built under long-term contracts.
Skills plan for engineering and building services
Comprehensive industry report highlights persistent skills challenges across the sector.
Choosing the right design team for a D&B Contract
An architect explains the nature and needs of working within this common procurement route.
Statement from the Interim Chief Construction Advisor
Thouria Istephan; Architect and inquiry panel member outlines ongoing work, priorities and next steps.